Pinnacle Peak, Tetonia
The public record on the 150-lot first phase and the 389.25-acre annexation request, from the Jackson Hole Journal and The Valley Signal.
Comments dueNov. 305 p.m.
What Pinnacle Peak would change in Tetonia
The first phase would add 150 homes to a city that counted 308 people in the 2020 census, and the developer’s filings describe 780 homes and a youth baseball resort in all (city wastewater study, p. 13; hearing notice; TischlerBise, p. 5). The draft agreements before the city would set terms for water, sewer, roads, parks and housing (the draft agreements).
Water and sewerCity staff wrote that the city lacks water capacity without mitigation, the developer’s engineer now lists none to spare, and the water rights on the land are for seasonal irrigation.
- City staff wrote Oct. 28 that “the City does not have the water capacity to service this subdivision without mitigation” (staff report, p. 6).
- The developer’s engineer lists “Available ERUs Before Required Upgrades: 0” for water, and the developer wrote on Nov. 19 that “no connections can be made until additional water rights are received and a well is installed” (water report, Nov. 18, p. 3; response worksheet, p. 8).
- PFG Idaho’s three water rights on the land total 1.00 cfs, all recorded for irrigation, and 0.70 cfs is leased to the state Water Supply Bank through Dec. 31, 2028 (IDWR split table, p. 2; IDWR report 22-14670, pp. 1-2).
- The city engineer puts a third sewer aerator at 88 units above the 201 in the city’s study: “These limits apply to the entire City system, not just Pinnacle Peak” (engineer’s review, Nov. 12, p. 2). The developer’s sewer report says Phase 3 will exceed the 88 (sewer report, p. 4).
- The draft agreements would have the city charge “Five Hundred Thousand Dollars ($500,000.00) per connection” for each outside connection to the owner-funded system and remit it to the owners, and would reserve water capacity “for the exclusive use” of the project (annexation agreement, §§ 5.3-5.4; development agreement, § 8).
- Ordinance 2026-09, adopted Sept. 30, requires water mitigation for development of more than two equivalent dwelling units and for “all annexations,” approved by the City Council and completed before a final plat is recorded, or by a later date the council approves in a development agreement (council minutes, p. 1; the ordinance).
TrafficThe state transportation department wrote in August that three signals on Highway 33 are required, and the draft agreement would pave Perry Avenue without sidewalks.
- The Idaho Transportation Department wrote that “Signals are required at Lucas Lane, Chloe/Asher, and Perry Ave given the traffic impacts to the highway, warranted from this development” (ITD comment, Aug. 24, 2026).
- A second ITD email the same day says the signals “along with turn lanes will be the responsibility of the developer,” and that ITD will “need to see the revised TIS before finalizing our comments and requirements” (ITD email, p. 1).
- Once the rest of the land is annexed, the draft development agreement would have the developer pave Perry Avenue. The work “shall consist solely of a twenty-four foot (24’) paved travel lane and associated striping.” The developer “shall have no obligation to construct or install any sidewalks,” and the duty ends “if Annexation has not occurred on or before March 31, 2027” (draft development agreement, § 25.2).
- Once the developer’s five-year street period and three-year open-space period after the city’s acceptance end, “all maintenance of the streets, open space, and all other Public Improvements within the Development shall be the sole responsibility of the City” (§ 10.2(d)).
- The developer’s traffic counts were taken on a Thursday and a Saturday in December 2025 and raised 52 percent “to reflect the peak season” (KLOA Phase I study, pp. 8-9).
HousingThe draft would set aside at least 3 of the 60 townhome lots as affordable, up to 120 percent of area median income.
- “Affordable Lots” would be “not less than five percent (5%) of such total townhome lots (i.e., three (3) townhome lots)” if 60 are platted, affordable to households earning up to 120 percent of Teton County area median income (draft development agreement, §§ 1.13-1.14).
- Affordable Lots are defined as townhome lots, so no single-family lot is set aside (§§ 1.14, 10.3). Affordability could come through Teton County Housing Authority oversight or a 10-year resale covenant limiting price increases to 3.5 percent a year (§ 1.13).
- Teton Valley Housing wrote that “Three of 150 lots is 2%” (Teton Valley Housing, Oct. 30, p. 4). It puts the county’s median home sale price at about $950,000 for the three months ending September 2026, citing Redfin (p. 3).
- The draft is unsigned, and the developer’s Nov. 19 resubmittal did not include a revised version; nothing in that filing changes these terms (open questions; City review and answers).
Rail Trail crossingsRoad and utility crossings of the Ashton-Tetonia Trail need state easements, and the developer says getting them is the city’s job.
- On Oct. 9 the Idaho Department of Parks and Recreation rejected “a one-time payment of $6,600.00 for three easements” across the trail (IDPR letter, p. 1).
- City staff wrote that “neither the Developer nor the City has an easement from Idaho State Parks to cross the Rail Trail for utilities and/or roads” (staff report, p. 5).
- The contract planner recommended “that the Developer obtain the required Rail Trail easements before the subdivision proceeds” (planner’s memo, p. 7).
- The developer answered on Nov. 19: “City is responsible for coordination and obtaining necessary easements and permits for crossing Rails-to Trails” (response worksheet, p. 12).
Speed of the timelineWritten comments are due Nov. 30 and the hearing is Dec. 7; the developer’s revised filings arrived Nov. 19.
- Nov. 19: the developer’s resubmittal is received; the development agreement is unchanged from the Oct. 9 draft (response worksheet; City review and answers).
- By Nov. 25: a further response from the Idaho Transportation Department to the Jackson Hole Journal’s questions on Highway 33, its District 6 public information officer wrote on Nov. 19 (email to the Journal).
- Nov. 26: Thanksgiving.
- Nov. 30: written comments due by 5 p.m.; “Verbal and written comments will also be accepted during the public hearing” (hearing notice, p. 1).
- Week of Nov. 30: Teton School District 401 says it will answer the Jackson Hole Journal’s questions after the Thanksgiving break; reviewers at Eastern Idaho Public Health and the Department of Environmental Quality are out of the office until then (replies to the Journal).
- Dec. 7: Planning and Zoning hearing on the plat, 7 p.m.; the commission recommends and the City Council decides (How the decision works).
- Staff wrote that “all application materials, revisions to the Plat and Development Agreement would need to be complete and ready for public comment by 11/20” (staff report, p. 2).
- If the city engineer neither accepts finished improvements nor sends a list of deficiencies within 30 days, the draft agreement says they “shall be deemed to have achieved Substantial Completion for all purposes” (draft development agreement, § 20).
Baseball and short-term rentalsA youth baseball resort is planned on 159.35 acres; the developer says the largest share of the resort’s projected non-property tax revenue would come from Tetonia’s 5% lodging fee.
- The annexation narrative describes “a 159.35-acre baseball and recreation complex” (annexation narrative, p. 6).
- The resort’s traffic study lists six baseball fields in Phase I and says “18 baseball fields will be constructed upon full buildout” (KLOA resort study, p. 12).
- The narrative projects the resort’s non-property tax revenue for Tetonia at “over $477,000 per year” once fully operational, and says “The largest chunk will be from Tetonia’s 5% fee on lodging, charged to each week’s participants” (p. 8).
- Tetonia’s Ordinance 2025-05 applies the 5% lodging tax to rentals “for a period of thirty (30) days or less” at “hotels, motels, hotel rooms, motel rooms, condominiums, homes, rooms, campgrounds” and other lodging (Ordinance 2025-05, § 2(A)).
- None of the traffic studies, the annexation narrative or the two draft agreements names the hotels or short-term rentals visiting families would use (open questions).